292 B
292 B
Project Requirements
- Connectivity: High-bandwidth internet access is required.
- Location: Well-defined deployment sites must be available.
- Timeline: The first nodes should be operational within 6 months.
- Funding: Initial capital for the rollout needs to be secured.